When Essex Waste and Urbaser Balfour Beatty (UBB) sought a bespoke tracked sliding gate to control access on their new state-of-the-art waste treatment facility, what better solution than a quality Zabag Security gate, installed by ourselves.

This slideshow requires JavaScript.

This brand new facility is larger than Wembley Stadium and one of the first in Europe to process almost all the waste away from landfill and into recyclable material streams.  The telescopic sliding gate is clad in heat-treated softwood, as is much of the building, to soften the impact on the sky line.  A proven solution, where run-back space is limited, tracked sliding gates offer a secure and reliable means of physical access control.